A Team Effort
Large projects, like this seed corn facility, can take months to move through the shop. It starts with the design team finalizing the drawings, then all material and piece parts are ordered. Once the steel arrives, the process starts with shot blasting the material, sawing the material to length, drilling and coping any holes or …